
Modular Home Set
This video requires the Adobe® Flash® Player to view. You can get the latest version by clicking the button below.

- Modules Delivered/Received
- Unwrap Modules
- Check Inventory of Ship-Loose Materials
- Mark Mating Lines on the Foundation
- Locate Pick-Poins on the Modules, Prepare for Lifting
- Module Set
- Fasten and Check Module
- Prepare Mating Surfaces
- Prepare Wires, Pipes, Ducts and Stairs
- Posts/Support Columns Set/Installed
- Stairs to Basement Set/Installed
- Lift Jointed Roof Sections with Crane
- Lift Dormers and Other Roof Elements
- Make the Home Weather-Tight and Secure
- Sign Set-Release